Site Loader
Get a Quote
Block 40 Block 15040, 7th District Obour City, El Qalioubeya

– Installation of factory piping network.

– Fabrication and installation of oil tanks.

-Maintenance work for steam boilers and network.

– Installation of production line.

Post Author:

Leave a Reply

Your email address will not be published.